AZ/DOT: Santa Maria River Bridge Replacement
Closed · Arizona · Last reported Jul 2025
Source: Dodge
Right of Way Survey and Final R/W Plans for the Santa Maria River Bridge replacement. The R/W project is located approximately 6 miles southeast of the intersection with SR 97 and 10 miles southeast of the Town of Bagdad. The purpose of the design project is to replace the current bridge over the Santa Maria River with a new bridge in a new alignment. SANTA MARIA RIVER BRIDGE Northwest REPLACE BRI
- Status
- Closed
- Sector
- Road, Bridge, Commercial
- Location
- Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about AZ/DOT: Santa Maria River Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Right of Way Survey and Final R/W Plans for the Santa Maria River Bridge replacement. The R/W project is located approximately 6 miles southeast of the intersection with SR 97 and 10 miles southeast of the Town of Bagdad. The purpose of the design project is to replace the current bridge over the Santa Maria River with a new bridge in a new alignment. SANTA MARIA RIVER BRIDGE Northwest REPLACE BRIDGE 10.0 SR 96 Bridge 225 milepost 10 to 11 (1 mile) Right of Way Survey and Final R/W Plans for ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
