AZ/DOT: Shelby Dr Business Development Phase 2
Bidding · Arizona · Last reported Sep 2025
Source: Dodge
The proposed project is located in Yavapai County along Shelby Road in the City of Sedona. The proposed work consists of removing existing concrete sidewalk and driveways and constructing new concrete multi use path, and driveways. The work also includes installing drainage improvements, sidewalk ramps, metal handrail, scuppers, curb and gutter, signs, pavement markings, utility adjustments and re
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Car parking, Rail, Mass Transit, Road, Water Supply and Storage, Power Transmission, Automotive, Power Generation (CCGT), Commercial, Cement, Metal
- Location
- Prescott, Arizona, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about AZ/DOT: Shelby Dr Business Development Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The proposed project is located in Yavapai County along Shelby Road in the City of Sedona. The proposed work consists of removing existing concrete sidewalk and driveways and constructing new concrete multi use path, and driveways. The work also includes installing drainage improvements, sidewalk ramps, metal handrail, scuppers, curb and gutter, signs, pavement markings, utility adjustments and relocations, and other related work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Prescott |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Car parking, Rail, Mass Transit, Road, Water Supply and Storage, Power Transmission, Automotive, Power Generation (CCGT), Commercial, Cement, Metal |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
