logo

AZERBAIJAN: SILK ROAD

Sector: Residential • Location: Azerbaijan

Source: European Bank for Reconstruction and Development (EBRD)

Project
Complete

Reconstruction of an 85 km section of road from Gazi Mamed to Kyurdamir, together with assistance with road sector restructuring. The project objectives are: The project will assist with the restructuring of the RTSD and provide recommendations on road sector financing. Road Transport Services Department (RTSD) USD 41.0 million USD 46.6 million The environmental impact associated with the proposed

Project Information FAQ

Project Information

4 Q
The project “AZERBAIJAN: SILK ROAD” is an infrastructure initiative in the Residential sector, located in Azerbaijan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Reconstruction of an 85 km section of road from Gazi Mamed to Kyurdamir, together with assistance with road sector restructuring. The project objectives are: The project will assist with the restructuring of the RTSD and provide recommendations on road sector financing. Road Transport Services Department (RTSD) USD 41.0 million USD 46.6 million The environmental impact associated with the proposed rehabilitation of the existing road is unlikely to be significant (and would therefore normally be screened B 1 requiring an Environmental Analysis). The road is located in a sparsely populated area in the Mugan Desert, where the terrain is completely flat and the road runs in long straight lines of up to 40 km. However, the project might also involve the construction of a new bypass around Kyurdamir. Because of this project element an Initial Environmental Examination (IEE) will be carried out to assess potential impacts. Based on the findings of the IEE a screening category will be allocated and additional environmental due diligence carried out as required. Western consultants have already carried out the environmental analysis as part of an overall feasibility study funded by TRACECA (Transport Corridor Europe/Caucasus/central Asia), an EC Tacis programme. This does not include the proposed bypass. The key issues that were identified were the restoration of borrow pits (quarries), road safety measures and the environmental impact related to construction. It also identified a number of "opportunities for positive environmental enhancement", including improvement of road safety, reduction of soil pollution at existing vehicle repair ramps and waste management. Technical cooperation will be required for:

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data