AZERBAIJAN: SILK ROAD
Sector: Road • Location: Azerbaijan
Source: European Bank for Reconstruction and Development (EBRD)
Reconstruction of an 85 km section of road from Gazi Mamed to Kyurdamir, together with assistance with road sector restructuring. The project objectives are: The project will assist with the restructuring of the RTSD and provide recommendations on road sector financing. Road Transport Services Department (RTSD) USD 41.0 million USD 46.6 million The environmental impact associated with the proposed
- Status
- Closed
- Sector
- Road, Residential, Waste Processing and Treatment, Government
- Location
- Azerbaijan
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about AZERBAIJAN: SILK ROAD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Reconstruction of an 85 km section of road from Gazi Mamed to Kyurdamir, together with assistance with road sector restructuring. The project objectives are: The project will assist with the restructuring of the RTSD and provide recommendations on road sector financing. Road Transport Services Department (RTSD) USD 41.0 million USD 46.6 million The environmental impact associated with the proposed rehabilitation of the existing road is unlikely to be significant (and would therefore normally be screened B 1 requiring an Environmental Analysis). The road is located in a sparsely populated area in the Mugan Desert, where the terrain is completely flat and the road runs in long straight lines of up to 40 km. However, the project might also involve the construction of a new bypass around Kyurdamir. Because of this project element an Initial Environmental Examination (IEE) will be carried out to assess potential impacts. Based on the findings of the IEE a screening category will be allocated and additional environmental due diligence carried out as required. Western consultants have already carried out the environmental analysis as part of an overall feasibility study funded by TRACECA (Transport Corridor Europe/Caucasus/central Asia), an EC Tacis programme. This does not include the proposed bypass. The key issues that were identified were the restoration of borrow pits (quarries), road safety measures and the environmental impact related to construction. It also identified a number of "opportunities for positive environmental enhancement", including improvement of road safety, reduction of soil pollution at existing vehicle repair ramps and waste management. Technical cooperation will be required for: |
Original sector | Transport |
Location
Country | Azerbaijan |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Road, Residential, Waste Processing and Treatment, Government |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Azerbaijan
- Highway 2
- Shemakhy-Muganli Road Section Rehabilitation
- Highway 2 - Additional Financing
- Baku-Tbilisi-Kars Railway
- Road Network Development Program - Tranche 2
- Second Additional Financing Highway II
- Second Road Network Development Investment Program - Tranche 2
- Baku to Samur Road Rehabilitation Project (Sumgait-Zarat Section)
