In December 2012, MIGA issued guarantees totaling $116.1 million covering an investment by Globeleq Holdings (Azito) Limited of Bermuda in the Azito Thermal Power Plant in Côte d'Ivoire. The coverage is for a period of up to 20 years against the risk of breach of contract. The project involves the conversion of the existing Azito Thermal Power Plant from simple-cycle to combined-cycle. This will

Project Information FAQ

Project Information

5 Q
The project “Azito Thermal Power Plant and Expansion” is an infrastructure initiative in the Commercial sector, located in Côte d'Ivoire. Taiyo aggregates data on it from Multilateral Investment Guarentee Agency (MIGA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In December 2012, MIGA issued guarantees totaling $116.1 million covering an investment by Globeleq Holdings (Azito) Limited of Bermuda in the Azito Thermal Power Plant in Côte d'Ivoire. The coverage is for a period of up to 20 years against the risk of breach of contract. The project involves the conversion of the existing Azito Thermal Power Plant from simple-cycle to combined-cycle. This will include the addition of a steam turbine generator and heat recovery systems as well as the facilities and equipment required to connect the generator to the plant's 225 kV substation. The project will add approximately 140 megawatts of installed capacity to the grid, without requiring any additional gas supply, for a total plant installed capacity of approximately 430 megawatts. Since the expansion from a simple-cycle to a combined-cycle plant was foreseen when the first phase of the project was completed in 1999, the related facilities and transmission line were designed to accommodate the full plant expansion and output. Côte d'Ivoire's energy infrastructure suffers from lack of maintenance, system overload, and financial difficulties. Due to limited access, over three-quarters of households are dependent on cheap wood charcoal, though this has environmental and health costs in the long term. The project is aligned with the World Bank Group's Country Assistance Strategy for Côte d'Ivoire, which stresses the critical importance of building energy capacity to sustain economic progress. MIGA's support for this investment is also aligned with the agency's strategy of supporting investments into countries eligible for concessional lending from the International Development Association, countries affected by conflict, and complex infrastructure projects.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data