Azura Edo IPP

Active · Nigeria

Source: IFC Project Disclosures

The Azura-Edo IPP is a 450-500 MW gas-fired open cycle power plant located in the North Eastern outskirts of Benin City in Edo, Nigeria (“the Project”), with an estimated project cost of US$[622] million. The Project will be adjacent to an existing 450 MW state-owned thermal power plant (Ihovbor) and will benefit from proximity to: (i) the Escravos Lagos Pipeline System (“ELPS&#8

Status
Prospective
Sector
Power Transmission, Power Generation (CCGT), Geothermal
Location
Nigeria
Updated
19 Nov 2026
Source
IFC Project Disclosures

ConstructChat

Ask ConstructChat about Azura Edo IPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Azura Edo IPP” is an infrastructure initiative in the Power Transmission sector, located in Nigeria. Taiyo aggregates data on it from IFC Project Disclosures.

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The Azura-Edo IPP is a 450-500 MW gas-fired open cycle power plant located in the North Eastern outskirts of Benin City in Edo, Nigeria (“the Project”), with an estimated project cost of US$[622] million. The Project will be adjacent to an existing 450 MW state-owned thermal power plant (Ihovbor) and will benefit from proximity to: (i) the Escravos Lagos Pipeline System (“ELPS”), a 1 billion scfd gas trunk line currently being expanded to double its capacity; (ii) the existing Benin Main Substation and the new Benin North Substation (being built); and (iii) the largest and most critical node in the country’s transmission network. The Project also comprises the construction of a short transmission line (<1 km) to the adjacent Benin North Substation, and a short pipeline spur (c. 1km) connecting the power plant to the ELPS. It is the first phase of a planned two-phase project to expand capacity to 1,000 MW by 2018. In addition to a potential IFC investment in the form of a senior unsecured loan, the project has been nominated by the Nigerian Ministry of Finance for participation in a series of World Bank Partial Risk Guarantees. The project is also expected to benefit from insurance provided by the World Bank''s Multilateral Investment Guarantee Agency.

Original sector

Power Generation

Location

Country

Nigeria

Source

Source

IFC Project Disclosures

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT), Geothermal

Article published date

2026-09-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project