logo

Azura Edo IPP

Sector: Oil and Gas • Location: Nigeria

Source: International Finance Corporation (IFC)

Project
Active

The Project consists of a Greenfield 450 MW (net) open cycle gas turbine (“OCGT”) power plant covering approximately 12.5ha of a 102ha site located in Edo State, Nigeria. The Project site is located to the north-east of Benin City, adjacent to the existing NIPP, just outside the limits of the built up area and within the Benin bypass road. It mainly consists of secondary forest, subsistence farmi

Project Information FAQ

Project Information

4 Q
The project “Azura Edo IPP” is an infrastructure initiative in the Oil and Gas sector, located in Nigeria. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project consists of a Greenfield 450 MW (net) open cycle gas turbine (“OCGT”) power plant covering approximately 12.5ha of a 102ha site located in Edo State, Nigeria. The Project site is located to the north-east of Benin City, adjacent to the existing NIPP, just outside the limits of the built up area and within the Benin bypass road. It mainly consists of secondary forest, subsistence farming (slash and burn practices), plantation (palm oil, rubber), and dwellings and footpaths. The Project Sponsor is Azura Power West Africa Limited (“Azura”), a subsidiary of Amaya Capital Limited (“Amaya”). The OCGT plant has been designed to accommodate the potential conversion to Closed Cycle Gas Turbine (CCGT) with a total net output of approximately 670 MW. There are two associated facilities: an above ground 300kV transmission line (less than 1 km), with two pylons, connecting the Project site to the Benin North substation (adjacent to the Project site); and an underground gas pipeline spur of approximately 1km in length connecting the power plant to the Escravos Lagos Pipeline System (“ELPS”). The existing Benin-North substation is not an associated facility given that its use predates the Project. The World Bank is involved in the restructuring of the energy sector in Nigeria, and is expected to have a role in this Project through the partial risk guarantee (“PRG”) scheme being proposed. Azura is one of 14 IPPs nominated by the Nigerian Federal Ministry of Finance for participation in the proposed PRG series. MIGA is considering providing political risk insurance for the Project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data