Azura Edo IPP

Sector: Power Transmission • Location: Nigeria

Source: International Finance Corporation (IFC)

Project
Active

The Azura-Edo IPP is a 450-500 MW gas-fired open cycle power plant located in the North Eastern outskirts of Benin City in Edo, Nigeria (“the Project”), with an estimated project cost of US$[622] million. The Project will be adjacent to an existing 450 MW state-owned thermal power plant (Ihovbor) and will benefit from proximity to: (i) the Escravos Lagos Pipeline System (“ELPS”), a 1 billion scfd

Project Information FAQ

Project Information

4 Q
The project “Azura Edo IPP” is an infrastructure initiative in the Power Transmission sector, located in Nigeria. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Azura-Edo IPP is a 450-500 MW gas-fired open cycle power plant located in the North Eastern outskirts of Benin City in Edo, Nigeria (“the Project”), with an estimated project cost of US$[622] million. The Project will be adjacent to an existing 450 MW state-owned thermal power plant (Ihovbor) and will benefit from proximity to: (i) the Escravos Lagos Pipeline System (“ELPS”), a 1 billion scfd gas trunk line currently being expanded to double its capacity; (ii) the existing Benin Main Substation and the new Benin North Substation (being built); and (iii) the largest and most critical node in the country’s transmission network. The Project also comprises the construction of a short transmission line (<1 km) to the adjacent Benin North Substation, and a short pipeline spur (c. 1km) connecting the power plant to the ELPS. It is the first phase of a planned two-phase project to expand capacity to 1,000 MW by 2018. In addition to a potential IFC investment in the form of a senior unsecured loan, the project has been nominated by the Nigerian Ministry of Finance for participation in a series of World Bank Partial Risk Guarantees. The project is also expected to benefit from insurance provided by the World Bank''s Multilateral Investment Guarantee Agency.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data