Azure Clean
Sector: Raw Materials • Location: India
Source: International Finance Corporation (IFC)
Azure Clean Energy Private Limited is a special purpose vehicle (SPV) of Azure Power India Private Limited, an independent power producer which builds, owns and operates small and medium-scale solar power plants in India. Currently, it has installed capacity of 56 MW of solar projects across Punjab (2MW), Rajasthan (40 MW) and Gujarat (10 MW). Azure also provides EPC and O&M services for all its p
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Azure Clean Energy Private Limited is a special purpose vehicle (SPV) of Azure Power India Private Limited, an independent power producer which builds, owns and operates small and medium-scale solar power plants in India. Currently, it has installed capacity of 56 MW of solar projects across Punjab (2MW), Rajasthan (40 MW) and Gujarat (10 MW). Azure also provides EPC and O&M services for all its plants (both under construction and operational).The company plans to set up a 40 MW solar photovoltaic (PV) plant (the “project”) in Nandiya Kalan & Hardhani villages in Baori Tehsil of Jodhpur district in the state of Rajasthan, India. The site is located approximately 55 km from Jodhpur town and nearly 2 km from the nearest villages (Hardhani and Nandiya Kalan). The site setting is rural and the proposed project is the first solar plant that will be developed in the area. Azure has plans to develop another 60 MW capacity solar PV plant in the same area. The direct current (DC) power from the solar panels will be sent to an inverter to convert the DC power into alternate current (AC) power which will be locally pooled before being fed into the utility power grid system. The power generated from the proposed solar power plant shall be evacuated through a 132 kv transmission line to Bhawad sub-station of Rajasthan Vidyut Vitran Nigam Limited (RVPNL) located approximately 23 km from the project site. The company has signed a Power Purchase Agreement (PPA) with Solar Energy Corporation of India (“SECI”) for 25 years. The total project cost is estimated at $45.8 million with a proposed IFC loan of approximately $14.3 million for IFC’s own account. The construction phase is expected to start in September 2014 and expected to last for 4-6 months. The project is planned for commissioning by the end of April 2015.The project site area is located in revenue/state land belonging to Nandiya Kalan & Hardhani villages in Baori Tehsils of the Jodhpur district. The total land area required for the project is around 140 hectares spread over two contiguous land parcels separated by a public road and includes land for an access road, internal lines, an office/administrative building and a maintenance area. Construction worker camp (1) will be located within the project site area. The proposed route of the transmission line passes through four villages namely Anwana, Kelawa, Khari and Bhawad and involves a mix of revenue/state and private land |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
