Azure Power 34 MW Solar Project_Punjab

Sector: Solar • Location: India

Source: World Bank Group

Project
Active

In December 2013, Azure Energy Private Limited (AEPL), signed an MoU with Punjab Energy Development Agency (PEDA) for setting up a 34-MW photovoltaic solar project at two locations - district Muktsar and district Fazilka in the state of Punjab under the Punjab New & Renewable Sources of Energy (NRSE) Policy 2012. The output from the project would be fed to the North-East-West-North-East (NEWNE) gr

Status
Prospective
Sector
Solar, Power Generation (CCGT), Power Transmission, Government, Commercial
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Azure Power 34 MW Solar Project_Punjab

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Azure Power 34 MW Solar Project Punjab” is an infrastructure initiative in the Solar sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In December 2013, Azure Energy Private Limited (AEPL), signed an MoU with Punjab Energy Development Agency (PEDA) for setting up a 34-MW photovoltaic solar project at two locations - district Muktsar and district Fazilka in the state of Punjab under the Punjab New & Renewable Sources of Energy (NRSE) Policy 2012. The output from the project would be fed to the North-East-West-North-East (NEWNE) grid of India. The project has deployed thin-film technology. Power evacuation was planned through a 66KV line to substation, which, as per the state policy, was the responsibility of Punjab state transmission utility. Azure Energy Private Limited had entered into a 25-year Power Purchase Agreement with Punjab State Power Corporation Limited (PSPCL), which was the agency to purchase solar power generated by independent solar power producers. The PPA would be effected at the time of commissioning of the project. The CERC determined tariff for normal rate of depreciation was INR 8.75/kWh (US$ 0.143/kWh)and for accelerated rate of depreciation was INR 7.87/kWh (US$ 0.129/kWh). Transmission and/or wheeling charges would be paid by AEPL. The project attained financial closure on 13th March 2014 with a debt/equity ratio of 75/25. The estimated project cost at the time of financial closure was US$ 41.1mn (INR 2510mn @61 INR/USD). Financing comprised of Debt of US$ 30.8mn (INR 1880mn) and sponsor equity of US$ 10.3mn (INR 30mn). The 14-year 6-months term loan was arranged by PTC India Financial services Limited. The plant construction started in January 2014 and was commissioned on 30th October 2014.

Original sector

Energy

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Power Transmission, Government, Commercial

Article published date

2024-09-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project