Azure Power 34 MW Solar Project_Punjab

Sector: Solar • Location: India

Source: World Bank Group

Project
Active

In December 2013, Azure Energy Private Limited (AEPL), signed an MoU with Punjab Energy Development Agency (PEDA) for setting up a 34-MW photovoltaic solar project at two locations - district Muktsar and district Fazilka in the state of Punjab under the Punjab New & Renewable Sources of Energy (NRSE) Policy 2012. The output from the project would be fed to the North-East-West-North-East (NEWNE) gr

Project Information FAQ

Project Information

5 Q
The project “Azure Power 34 MW Solar Project Punjab” is an infrastructure initiative in the Solar sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In December 2013, Azure Energy Private Limited (AEPL), signed an MoU with Punjab Energy Development Agency (PEDA) for setting up a 34-MW photovoltaic solar project at two locations - district Muktsar and district Fazilka in the state of Punjab under the Punjab New & Renewable Sources of Energy (NRSE) Policy 2012. The output from the project would be fed to the North-East-West-North-East (NEWNE) grid of India. The project has deployed thin-film technology. Power evacuation was planned through a 66KV line to substation, which, as per the state policy, was the responsibility of Punjab state transmission utility. Azure Energy Private Limited had entered into a 25-year Power Purchase Agreement with Punjab State Power Corporation Limited (PSPCL), which was the agency to purchase solar power generated by independent solar power producers. The PPA would be effected at the time of commissioning of the project. The CERC determined tariff for normal rate of depreciation was INR 8.75/kWh (US$ 0.143/kWh)and for accelerated rate of depreciation was INR 7.87/kWh (US$ 0.129/kWh). Transmission and/or wheeling charges would be paid by AEPL. The project attained financial closure on 13th March 2014 with a debt/equity ratio of 75/25. The estimated project cost at the time of financial closure was US$ 41.1mn (INR 2510mn @61 INR/USD). Financing comprised of Debt of US$ 30.8mn (INR 1880mn) and sponsor equity of US$ 10.3mn (INR 30mn). The 14-year 6-months term loan was arranged by PTC India Financial services Limited. The plant construction started in January 2014 and was commissioned on 30th October 2014.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data