logo

Azuria Water Solutions Fusible PVC Pipe Manufacturing Facility

One of 10,000+ projects Taiyo tracks in Mississippi.

Source: Magnolia Tribune

Project
Under Construction

Azuria Water Solutions is constructing a new 72,000-square-foot Fusible PVC Pipe manufacturing facility adjacent to its existing plant in Batesville. The project involves an $80 million investment aimed at creating 50 jobs. The plant will produce Fusible PVC Pipe used for water, sewer, and conduit systems, serving municipal and industrial users.

Status
Under Construction
Sector
Waste Processing and Treatment, Government, Water Supply and Storage, Manufacturing (Industrial)
Location
Batesville, Mississippi, United States of America
Updated
22 Jul 2026
Source
Magnolia Tribune

ConstructChat

Ask ConstructChat about Azuria Water Solutions Fusible PVC Pipe Manufacturing Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Azuria Water Solutions Fusible PVC Pipe Manufacturing Facility” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Batesville, Mississippi, United States. Taiyo aggregates data on it from Magnolia Tribune.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Azuria Water Solutions is constructing a new 72,000-square-foot Fusible PVC Pipe manufacturing facility adjacent to its existing plant in Batesville. The project involves an $80 million investment aimed at creating 50 jobs. The plant will produce Fusible PVC Pipe used for water, sewer, and conduit systems, serving municipal and industrial users.

Original sector

Manufacturing

Budget

Location

Country

United States of America (USA)

State

Mississippi

City

Batesville

Source

Source

Magnolia Tribune

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Government, Water Supply and Storage, Manufacturing (Industrial)

Article published date

2026-05-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project