B115 Life Extension Center- Lean-to Construction MACC
Sector: Water Supply and Storage • Location: Patuxent River, Maryland, United States of America
Source: Dodge USA
The scope of work includes but is not limited to providing all labor, materials, equipment, and supervision to the development of: H115 Center Lean-to Full DBB design to repair and renovate the interior of lean-to to meet all building codes. All Fire Protection systems require replacement, including the under slab fire water supply lines. Replacement of the under slab sanitary sewer lines is also
- Status
- Closed
- Sector
- Water Supply and Storage, Airport, Waste Processing and Treatment, Commercial, Raw Materials
- Location
- Patuxent River, Maryland, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about B115 Life Extension Center- Lean-to Construction MACC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work includes but is not limited to providing all labor, materials, equipment, and supervision to the development of: H115 Center Lean-to Full DBB design to repair and renovate the interior of lean-to to meet all building codes. All Fire Protection systems require replacement, including the under slab fire water supply lines. Replacement of the under slab sanitary sewer lines is also required. The first floor includes an explosive safety room and the 2nd floor requires secure spa... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Maryland |
City | Patuxent River |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Airport, Waste Processing and Treatment, Commercial, Raw Materials |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
