DESCRIPTION: THE FORMER SPINGARN HIGH SCHOOL, IS SLATED FOR REPURPOSEMENT AND PARTIAL MODERNIZATION BY THE DISTRICT OF COLUMBIA DEPARTMENT OF GENERAL SERVICES (DGS) TO HOUSE THE DC INFRASTRUCTURE ACADEMY'S (DCIA) NEW HEADQUARTERS. THE HIGH SCHOOL WAS DESIGNED AND CONSTRUCTED BETWEEN 1949  1952, OPENED IN 1952, AND CLOSED IN 2013. THE BUILDING IS A CONTRIBUTING STRUCTU

Project Information FAQ

Project Information

5 Q
The project "B2408738 - 2500 BENNING RD NE, WASHINGTON, DC 20002 - CONSTRUCTION" is an infrastructure initiative in the Water Supply and Storage, Commercial, Education, Tunnel, Government, Steel, Cement, Manufacturing (Industrial), Metal sector, located in Washington, United States of America (USA). Taiyo aggregates data from DC Open Data Portal, including information on sponsoring government bodies, EPCs, and contractors.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

permit issued

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Historic Districts: DESCRIPTION: THE FORMER SPINGARN HIGH SCHOOL, IS SLATED FOR REPURPOSEMENT AND PARTIAL MODERNIZATION BY THE DISTRICT OF COLUMBIA DEPARTMENT OF GENERAL SERVICES (DGS) TO HOUSE THE DC INFRASTRUCTURE ACADEMY'S (DCIA) NEW HEADQUARTERS. THE HIGH SCHOOL WAS DESIGNED AND CONSTRUCTED BETWEEN 1949  1952, OPENED IN 1952, AND CLOSED IN 2013. THE BUILDING IS A CONTRIBUTING STRUCTURE TO THE YOUNG, BROWN, PHELPS AND SPINGARN EDUCATIONAL CAMPUS HISTORIC DISTRICT. THE PROJECT IS SUBJECT TO THE 9B PROCESS AND HAS RECEIVED PRELIMINARY DESIGN APPROVALS. SINCE THE BUILDING CLOSED IN 2013 IT HAS BEEN SUBJECT TO VANDALISM, AND OPPORTUNISTIC SCAVENGERS. THE BUILDING HAS ENDURED SEVERAL FIRES, AND THE INTERIORS HAVE BEEN EXPOSED TO THE ELEMENTS AND EXHIBIT SIGNIFICANT WATER DAMAGE. CORE AND SHELL: THE SCOPE OF WORK INCLUDES STABILIZATION AND SELECTIVE RESTORATION OF THE EXISTING TO REMAIN MASONRY FACADE, EXTERIOR WINDOWS, EXTERIOR DOORS, SLOPED SLATE ROOF AND FLAT MEMBRANE ROOF. THE FOUR STORY BUILDING WITH THE GROUND LEVEL PARTIALLY BELOW GRADE IS STRUCTURED WITH REINFORCED CONCRETE AND STEEL, AND ENCLOSED BY A BRICK MASONRY CAVITY WALL ASSEMBLY. SELECTIVE REPAIR AND STABILIZATION OF THE STRUCTURE IS INCLUDED IN THIS WORK, ALONG WITH BUILDLING ENVELOPE MODERNIZATION. THE EXISTING BUILDING STAIRS AND CORRIDORS ARE EXISTING TO REMAIN; ONE NEW ELEVATOR IS PLANNED FOR THIS PROJECT. THE ANCILLARY BOILER HOUSE BUILDING IS PLANNED FOR RENOVATION AND MODERNIZATION. THE EXISTING BRICK MASONRY WALL WILL BE DISASSEMBLED AND REBUILT AS THE BASE OF NEW WALL AND ROOF CONSTRUCTION, RAISING THE HEIGHT OF THE ROOF FOR THE PROPOSED WMATA MECHANICAL SHOP. THE ORIGINAL SMOKE STACK IS EXISTING TO REMAIN AND NOT PART OF THIS SCOPE. INTERIORS: THE INTERIOR SCOPE OF WORK INCLUDES ABETMENT AND FIRE PROTECTION THROUGHOUT THE BUILDING. THE SPRINKLER SYSTEM WILL BE INSTALLED IN TWO PHASES, WITH THE FIRST PHASE IN THE NORTH HALF OF THE BUILDING. FULL MODERNIZATION AND FIRE SUPPRESSION OF THE UNOCCUPIED SOUTH SIDE OF THE BUILDING WILL OCCUR AS ADDITIONAL SPACE IS DEVELOPED WITHIN THE BUILDING. A 3-HOUR RATED PARTITION SEPARATES THE NORTH / SPRINKLERED SIDE OF THE BUILDING FROM THE SOUTH SIDE. THE DCIA PROJECT REQUIRES APPROX. 50,000 SF OF THE TOTAL 226,500 SF. THE 50,000 SF IS SPREAD OVER TWO FLOORS ON THE NORTH HALF OF THE BUILDING. INTERIOR MODERNIZATION WORK FOR THE DCIA PROJECT INCLUDES PARTIAL DEMOLITION OF THE ARCHITECTURAL INTERIORS ALONG WITH FULL DEMOLITION OF THE REMAINING MEP SYSTEMS. THE DCIA PROGRAMMED SPACE, CONNECTOR SPACES (SHARED BUILDING SPACES), HORIZONTAL CIRCULATION AND REQUIRED STAIRS (VERTICAL CIRCULATION FOR EGRESS) WILL RECEIVE A FULL MODERNIZATION. THIS WORK INCLUDES NEW PARTITIONS, CEILINGS, FINISHES, FURNITURE, MECHANICAL, ELECTRICAL, PLUMBING, AUDIO VISUAL AND SECURITY. THE REMAINING 176,500SF OF EXISTING BUILDING WILL BE SECURED AND CONVERTED INTO A COLD DARK SHELL IN PREPARATION FOR FUTURE REUSE. THE ORIGINAL GYMNASIUM, AUDITORIUM AND LIBRARY ARE NOT PART OF THIS SCOPE BUT ARE SEEN AS SOCIALLY SIGNIFICANT AND ARE PROPOSED AS REHABILITATION ZONES. PLANNED WORK INVOLVES A LEVEL 2 ALTERATION, BUILDING ADDITIONS, AND A CHANGE OF OCCUPANCY TO A HISTORIC BUILDING. THE RESTORATION AND REHABILITATION ZONES ARE INDICATED ON THE DRAWINGS. LEVEL 2 ALTERATIONS INCLUDE BUILDING ENVELOPE MODERNIZATION, THE ADDITION OF A BUILDING SPRINKLER SYSTEM ON THE NORTH SIDE, UPGRADES TO THE BUILDING ACCESSIBILITY, AND ALTERATIONS FOR TENANT IMPROVEMENTS. BUILDING ADDITIONS INCLUDE AN ACCESSIBLE ENTRY LOBBY ON THE GROUND FLOOR, REPURPOSING THE BOILER HOUSE STRUCTURE, PROVIDING A NEW SUPERSTRUCTURE AND INFILL ADDITIONS CONNECTING THE NEW STRUCTURE TO THE MAIN BUILDING (THE EXISTING BUILDINGS ARE CONNECTED AT THE TUNNEL AND LOWER LEVEL OF THE BOILER HOUSE). A LEVEL 3 ALTERATION FOR SELECTIVE DEMOLITION AND HAZARDOUS MATERIALS ABATEMENT IS ONGOING UNDER SEPARATE PERMIT. [NA

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data