logo
ProjectPermit IssuedBP

B2503741 - 222 11TH ST NE, WASHINGTON, DC 20002 - CONSTRUCTION

Permit issued · District of Columbia

Source: DC Open Data Portal

Remove the existing roof on all flat roof areas, excluding the small sloped roof with several skylights down to the wood deck; Furnish and install a 1 layer of ISO insulation to cover entire roof deck using screws and plates to secure to roof;Furnish and install a mechanically attached GAF.060 white TPO, secure to insulation;Furnish and install all flashing and counter flashings to provide a wate

Status
Prospective
Sector
Road, Water Supply and Storage, Commercial, Metal, Steel, Government
Location
Washington, District of Columbia, United States of America
Updated
19 Nov 2026
Source
DC Open Data Portal

ConstructChat

Ask ConstructChat about B2503741 - 222 11TH ST NE, WASHINGTON, DC 20002 - CONSTRUCTION

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “B2503741 - 222 11TH ST NE, WASHINGTON, DC 20002 - CONSTRUCTION” is an infrastructure initiative in the Road sector, located in Washington, District of Columbia, United States of America. Taiyo aggregates data on it from DC Open Data Portal.

Participants

Sponsoring Agency

Status

Original status

permit issued

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Remove the existing roof on all flat roof areas, excluding the small sloped roof with several skylights down to the wood deck; Furnish and install a 1 layer of ISO insulation to cover entire roof deck using screws and plates to secure to roof;Furnish and install a mechanically attached GAF.060 white TPO, secure to insulation;Furnish and install all flashing and counter flashings to provide a water tight roofing system, heat welded and fused together;Furnish and install a 12 TPO base flashing, heat welded along parapet walls;Furnish and install a TPO drip edge primed, heat welded and integrated into roofing system;Clean and remove all debris from job. Use nail magnets throughout yar and driveway. We are not label for any interior nail pops that may occur during roof replacement.Remove all existing wall; coping. Fabricate and install new wall coping using .032 aluminum to all parapet walls perimeter walls, color may be chosen by property owner.Remove and dispose of existing hatch door. Build new hatch door using 2x4 and ? plywood. Wrap new hatch door using GAF TPO. [NA

Budget

Location

Country

United States of America (USA)

State

District of Columbia

City

Washington

Source

Source

DC Open Data Portal

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Commercial, Metal, Steel, Government

Article published date

2025-10-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project