B2507605 - 401 N ST SW, WASHINGTON, DC 20024 - CONSTRUCTION
Source: DC Open Data Portal
Site of Tiber Island In the Commission of Fine Arts jurisdiction area
- Concrete Repairs: Balcony top surface partial depth, full depth, edge, and overhead soffit repairs along with vertical repair patch locations on the parapet walls.
- Balcony Waterproofing Membrane: Install new sealant at balcony perimeter, balcony concrete cracks, and railing posts/baseplates. Prepare balcony concr
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | permit issued |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Site of Tiber Island In the Commission of Fine Arts jurisdiction area 1. Concrete Repairs: Balcony top surface partial depth, full depth, edge, and overhead soffit repairs along with vertical repair patch locations on the parapet walls. 2. Balcony Waterproofing Membrane: Install new sealant at balcony perimeter, balcony concrete cracks, and railing posts/baseplates. Prepare balcony concrete deck and apply new urethane waterproofing membrane. 3. Balcony Soffit Acrylic Coating: Power wash and prepare balcony soffits. Apply acrylic coating to soffits and balcony undersides. 4. Elastomeric Parapet Wall Coating: Power wash and prepare balcony parapet walls. Install new acrylic-based elastomeric coating. 5. Elastomeric Sealant: Install new urethane sealant at areas described in #1 Concrete Repairs above, as well as fa?ade to balcony underside, fa?ade to balcony parapet walls, and vertical joints between Juliet balcony concrete slab edges. 6. Balcony Scupper Extensions: Install stainless steel scupper extensions at balconies. 7. Metal Balcony Railings: Paint Juliet railings, replacement of railing post sections with significant loss as identified by consultant (see detail 7/A003), and Fill railing posts with pourable sealant up to newly drilled hole in railing post. [NA |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
