B28 Bullet Train Project
Sector: Manufacturing (Industrial) • Location: India
Source: The Times of India
India's first bullet train project, jointly developed by BEML and Integral Coach Factory (ICF), designed for speeds up to 280 kmph. The prototype is expected to be completed early 2027 and scheduled to begin operations on a section of the Mumbai-Ahmedabad High-Speed Rail Corridor by August 2027.
- Status
- Under Construction
- Sector
- Manufacturing (Industrial), Rail
- Location
- India
- Updated
- 22 Jul 2026
- Source
- The Times of India
ConstructChat
Ask ConstructChat about B28 Bullet Train Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | India's first bullet train project, jointly developed by BEML and Integral Coach Factory (ICF), designed for speeds up to 280 kmph. The prototype is expected to be completed early 2027 and scheduled to begin operations on a section of the Mumbai-Ahmedabad High-Speed Rail Corridor by August 2027. |
Original sector | Transportation |
Location
Country | India |
Source
Source | The Times of India |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Rail |
Article published date | 2026-05-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project