B28 Indigenous Bullet Train
Sector: Rail • Location: Mumbai, Ahmedabad, India
Source: Trak.in
India's first indigenous bullet train project with a design speed of 280 kmph, developed through collaboration involving Integral Coach Factory (ICF) and BEML. The prototype supports operational speeds around 250 kmph and is expected to be used in the Mumbai-Ahmedabad High-Speed Rail corridor.
- Status
- Prospective
- Sector
- Rail, Manufacturing (Industrial)
- Location
- Mumbai, Ahmedabad, India
- Updated
- 22 Jul 2026
- Source
- Trak.in
ConstructChat
Ask ConstructChat about B28 Indigenous Bullet Train
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | India's first indigenous bullet train project with a design speed of 280 kmph, developed through collaboration involving Integral Coach Factory (ICF) and BEML. The prototype supports operational speeds around 250 kmph and is expected to be used in the Mumbai-Ahmedabad High-Speed Rail corridor. |
Original sector | Transportation |
Location
Country | India |
City | Mumbai, Ahmedabad |
Source
Source | Trak.in |
URL |
More Details
Record type | Project |
Sector | Rail, Manufacturing (Industrial) |
Article published date | 2026-05-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
