Hoang Anh Gia Lai Group (HAG) was planning the development of the 80 MW Ba Thuoc 2 hydropower plant, Thanh Hoa province, as well as the 60 MW Ba Thuoc 1 hydropower plant.

Commissioning was expected in late-2011; the second turbine of Ba Thuoc 2 became operational in February 2012. Construction started in September 2009. The two projects together were expected to generate up to 700 million kWh

Project Information FAQ

Project Information

4 Q
The project “Ba Thuoc 1 & 2 Hydropower Plant” is an infrastructure initiative in the Wind sector, located in Vietnam. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Hoang Anh Gia Lai Group (HAG) was planning the development of the 80 MW Ba Thuoc 2 hydropower plant, Thanh Hoa province, as well as the 60 MW Ba Thuoc 1 hydropower plant. Commissioning was expected in late-2011; the second turbine of Ba Thuoc 2 became operational in February 2012. Construction started in September 2009. The two projects together were expected to generate up to 700 million kWh annually. No further information was available. The project applied for UNFCCC/CDM financing. The equity ratio of the project was 70/30, according to the CDM PDD. The project was insured by BIC Insurance, announced January 2010. Total cost was estimated at VND 1.497 trillion ($71.8 million) for Ba Thuoc 2, and VND 2.4 trillion for both projects together ($115 million). Financial Close date was unknown, September 2009 was assumed (start construction). By dec 2011 the project had met the criteria for at least 25% of the construction to be complete. This was proved by the fact that the second turbine was operational in feb 2012. http://cdm.unfccc.int/Projects/Validation/DB/CS20MX1RLKM9GY2DJ3O3G9IQ169Y3P/view.html http://cdm.unfccc.int/filestorage/Q/Z/0/QZ0527DPT4SELGR9W3MFB1JIAOV8UX/Ba%20Thuoc%20PDD.pdf?t=eUV8bTF4NmJ2fDCPjl2MpdOmcIHqSHRNRAdL http://www.dailynews.vn/news/business-finance/business/137470-HAG-focus-on-carrying-out-final-phase-of-Ba-Thuoc-2-hydropower-plant.html http://www.uni-bros.com/en/news.php?id=13217&cid=3 Change to operational for 2012 update.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data