logo

Babel Acres 2ND Subdivision Water and Sewer Extension

Sector: Water Supply and Storage • Location: Wood River, Nebraska, United States of America

Source: Dodge USA

Project
Closed

800 to 1100 L.F. of 8 water main, three fire hydrants, valves and fittings. 600 to 1200 L.F. of 8 sewer main, two or four manholes and services 80 L.F. of 14 steel casing bored and jacked under Highway 11. This includes all associated work as described in the Plans and Specifications. The project will be bid as a Paving and Grading Contract and a Utility Contract.

Status
Closed
Sector
Water Supply and Storage, Road, Commercial, Power Transmission, Raw Materials, Power Generation (CCGT), Waste Processing and Treatment, Steel, Government, Metal
Location
Wood River, Nebraska, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Babel Acres 2ND Subdivision Water and Sewer Extension

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Babel Acres 2ND Subdivision Water and Sewer Extension” is an infrastructure initiative in the Water Supply and Storage sector, located in Wood River, Nebraska, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

800 to 1100 L.F. of 8 water main, three fire hydrants, valves and fittings. 600 to 1200 L.F. of 8 sewer main, two or four manholes and services 80 L.F. of 14 steel casing bored and jacked under Highway 11. This includes all associated work as described in the Plans and Specifications. The project will be bid as a Paving and Grading Contract and a Utility Contract.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Nebraska

City

Wood River

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Commercial, Power Transmission, Raw Materials, Power Generation (CCGT), Waste Processing and Treatment, Steel, Government, Metal

Article published date

2024-11-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project