logo

Babeldaob solar plant & battery storage system

Sector: Energy Storage • Location: Micronesia, Fed. Sts.

Source: World Bank Group

Project
Active

The project involves the construction of a 15.28MWp solar PV power plant and 10.2MWac / 12.9MWh battery energy storage system at Ngatpang on Babeldaob, the largest island in the Republic of Palau, Micronesia. The solar power plant is anticipated to deliver up to 23,000 MWh per year to the Palau Public Utilities Corporation's grid network, providing approximately 20% of Palau’s power needs. The spo

Status
Prospective
Sector
Energy Storage, Solar, Power Generation (CCGT), Government, Power Transmission
Location
Micronesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Babeldaob solar plant & battery storage system

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Babeldaob solar plant & battery storage system” is an infrastructure initiative in the Energy Storage sector, located in Micronesia, Fed. Sts.. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the construction of a 15.28MWp solar PV power plant and 10.2MWac / 12.9MWh battery energy storage system at Ngatpang on Babeldaob, the largest island in the Republic of Palau, Micronesia. The solar power plant is anticipated to deliver up to 23,000 MWh per year to the Palau Public Utilities Corporation's grid network, providing approximately 20% of Palau’s power needs. The sponsor is Solar Pacific Pristine Power Inc, a subsidiary of Solar Pacific, which is part of the Alternergy group. The Australian Infrastructure Financing Facility for the Pacific (AIFFP) - a A$2 billion fund managed through the Australian Department of Foreign Affairs and Trade - is providing the $22 million financing package. The debt consists of a 17-year, $18 million loan with fixed interest rate of 4.75% and a $4 million grant. The financing agreements were signed on 31 January, 2022 and financial close was achieved in April 2022. https://www.aiffp.gov.au/news/financing-agreements-improve-renewable-energy-infrastructure-palau https://www.aiffp.gov.au/investments/investment-list/palau-solar-plant-investment https://www.ashurst.com/en/news-and-insights/news-deals-and-awards/ashurst-advises-solar-pacific-pristine-power-on-palau-solar-and-battery-project-financing/ https://www.allens.com.au/insights-news/news/2022/04/allens-advises-on-the-project-financing-of-palau-solar/

Original sector

Energy

Budget

Location

Country

Micronesia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Energy Storage, Solar, Power Generation (CCGT), Government, Power Transmission

Article published date

2024-10-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project