Babina Greda Geothermal Power Plant Project
Sector: Power Generation (CCGT) • Location: Babina Greda, Croatia
Source: Balkan Green Energy News
ENNA Geo, through Geo Power Babina Greda, is developing a 15 MW geothermal power plant project in Babina Greda, northeastern Croatia. Drilling of the exploratory well Babina Greda GT-1 began in August 2025, with plans to drill the deep geothermal well and conduct production testing over the next 110 days.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Geothermal
- Location
- Babina Greda, Croatia
- Updated
- 22 Jul 2026
- Source
- Balkan Green Energy News
ConstructChat
Ask ConstructChat about Babina Greda Geothermal Power Plant Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ENNA Geo, through Geo Power Babina Greda, is developing a 15 MW geothermal power plant project in Babina Greda, northeastern Croatia. Drilling of the exploratory well Babina Greda GT-1 began in August 2025, with plans to drill the deep geothermal well and conduct production testing over the next 110 days. |
Original sector | Energy |
Location
Country | Croatia |
City | Babina Greda |
Source
Source | Balkan Green Energy News |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Geothermal |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
