logo

Bac Lieu Wind Farm

Sector: Wind • Location: Vietnam

Source: World Bank Group

Project
Active

Cong Ly was planning the development of the 16 MW first phase wind farm, Bac Lieu province, 200 km Soutwest of HCM City.

Equipment was to be supplied by GE (announced July 2011), 10 turbines of 1.6 MW and a long term maintenance contract. A phase II of the project was in the design phase, but would depend on the outcome of this project. Total capacity could grow by 120 MW in phase II. In the nat

Status
Prospective
Sector
Wind, Power Generation (CCGT), Raw Materials, Commercial, Government
Location
Vietnam
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Bac Lieu Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Bac Lieu Wind Farm” is an infrastructure initiative in the Wind sector, located in Vietnam. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Cong Ly was planning the development of the 16 MW first phase wind farm, Bac Lieu province, 200 km Soutwest of HCM City. Equipment was to be supplied by GE (announced July 2011), 10 turbines of 1.6 MW and a long term maintenance contract. A phase II of the project was in the design phase, but would depend on the outcome of this project. Total capacity could grow by 120 MW in phase II. In the national power development program for Vietnam, dating August 2010, the project was already included listing as 99 MW, and projected to produce 310 GWh annually, with 66 turbines spread over 500 hectares of land. Commissioning dates were unknown. Construction was scheduled to take three years. The output was to be bought by EVN at VND 1,614/kW ($78/MWh). Part will be subsidized by VND 207/kWh from the Vietnam Environment Protection Fund. Total cost was estimated at VND 4.5 trillion ($228.4 million). http://www.green-energy-news.com/nwslnks/clips711/jul11017.html Total cost of first 16 MW unknown. Commissioning dates unkown.

Original sector

Energy

Location

Country

Vietnam

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Wind, Power Generation (CCGT), Raw Materials, Commercial, Government

Article published date

2024-05-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project