Back Creek Parallel Interceptor Extension
Sector: Water Supply and Storage • Location: Harrisburg, North Carolina, United States of America
Source: Dodge USA
construction to consist of 22,000 lf of 30 inch gravity sewer within Charlotte and Harrisburg - 20,000 linear feet of 30-inch gravity sewer to serve the Back Creek Basin. The project begins at the existing Back Creek Parallel Interceptor at the confluence of Back Creek and Fuda Creek and extends west along Back Creek to the Mecklenburg County Line. - JUSTIFICATION: This project will provide additi
- Status
- Failure
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial, Raw Materials, Manufacturing (Industrial)
- Location
- Harrisburg, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Back Creek Parallel Interceptor Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | construction to consist of 22,000 lf of 30 inch gravity sewer within Charlotte and Harrisburg - 20,000 linear feet of 30-inch gravity sewer to serve the Back Creek Basin. The project begins at the existing Back Creek Parallel Interceptor at the confluence of Back Creek and Fuda Creek and extends west along Back Creek to the Mecklenburg County Line. - JUSTIFICATION: This project will provide additional conveyance capacity to the Back Creek Basin within Cabarrus and Mecklenburg County to meet f... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Harrisburg |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial, Raw Materials, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
