Backflow Prevention Phase 2B and 2C
Sector: Water Supply and Storage • Location: Gatineau, Quebec, Canada
Source: Dodge USA
Installation of backflow preventors on domestic water main entrance and fire suppression systems to support compliance with the highest industry drinking water protection standards. The project aims to ensure public safety and the long-term safety of our shared water resource and it s aiming for compliance under the Schedule I of the City of Ottawa s Water By-Laws.
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Road, Commercial, Waste Processing and Treatment
- Location
- Gatineau, Quebec, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Backflow Prevention Phase 2B and 2C
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Installation of backflow preventors on domestic water main entrance and fire suppression systems to support compliance with the highest industry drinking water protection standards. The project aims to ensure public safety and the long-term safety of our shared water resource and it s aiming for compliance under the Schedule I of the City of Ottawa s Water By-Laws. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Quebec |
City | Gatineau |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Road, Commercial, Waste Processing and Treatment |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
