Bad River Solid Waste Improvements - Utility Building REBID
One of 10,000+ projects Taiyo tracks in Wisconsin.
Source: Dodge
- Site grading and structural fill 2. 60 by 80 Utility Building with overhead doors including openers (2), man-door, lighting and electrical 3. Concrete slab and aprons 4. Gravel access road
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Power Transmission, Biomass, Power Generation (CCGT), Waste Processing and Treatment, Road, Commercial
- Location
- Odanah, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Bad River Solid Waste Improvements - Utility Building REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1. Site grading and structural fill 2. 60 by 80 Utility Building with overhead doors including openers (2), man-door, lighting and electrical 3. Concrete slab and aprons 4. Gravel access road |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Odanah |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Power Transmission, Biomass, Power Generation (CCGT), Waste Processing and Treatment, Road, Commercial |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
