logo
ProjectPlanned

BAD ROUTE INTERCHANGE - SW

Sector: Bridge • Location: Montana, United States of America

Source: Montana Department of Transportation (MDT)

The Bad Route Interchange - SW project is located on I-94 (eastbound and westbound lanes) beginning at the east end of the Yellowstone River Bridges (reference post 187.1) and extending about 5.7 miles to the Bad Route Rest Interchange (reference post 192.6). The project involves the reconstruction of about the 40 percent of the 5.7 miles towards the end of the project to correct the undulations i

Status
Prospective
Sector
Bridge, Car parking, Tunnel, Road, Government, Manufacturing (Industrial), Waste Processing and Treatment, Automotive
Location
Montana, United States of America
Updated
19 Nov 2026
Source
Montana Department of Transportation (MDT)

ConstructChat

Ask ConstructChat about BAD ROUTE INTERCHANGE - SW

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “BAD ROUTE INTERCHANGE - SW” is an infrastructure initiative in the Bridge sector, located in Montana, United States of America. Taiyo aggregates data on it from Montana Department of Transportation (MDT).

Participants

Sponsoring Agency

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The Bad Route Interchange - SW project is located on I-94 (eastbound and westbound lanes) beginning at the east end of the Yellowstone River Bridges (reference post 187.1) and extending about 5.7 miles to the Bad Route Rest Interchange (reference post 192.6). The project involves the reconstruction of about the 40 percent of the 5.7 miles towards the end of the project to correct the undulations in the roadway with the remainder receiving a mill and overlay. Additionally the project includes the rehabilitation or replacement of drainage structures in poor condition, median drainage improvements, bridge deck repairs on the Bad Route Interchange overpass, overlay of the Bad Route Interchange ramps, access road and rest area parking lot, wildlife exclusionary fencing from the Yellowstone River to a vehicular underpass about 4.2 miles east of the River, guardrail and signing upgrades. The purpose of this project is to extend the life of the existing pavement and address the dips in the road profile, rough ride and poor drainage with the goal of providing a safer, smoother roadway requiring less maintenance.

Budget

Location

Country

United States of America (USA)

State

Montana

Source

Source

Montana Department of Transportation (MDT)

URL

More Details

Record type

Project

Sector

Bridge, Car parking, Tunnel, Road, Government, Manufacturing (Industrial), Waste Processing and Treatment, Automotive

Article published date

2024-05-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project