BAD ROUTE INTERCHANGE - SW
Sector: Bridge • Location: Montana, United States of America
Source: Montana Department of Transportation (MDT)
The Bad Route Interchange - SW project is located on I-94 (eastbound and westbound lanes) beginning at the east end of the Yellowstone River Bridges (reference post 187.1) and extending about 5.7 miles to the Bad Route Rest Interchange (reference post 192.6). The project involves the reconstruction of about the 40 percent of the 5.7 miles towards the end of the project to correct the undulations i
- Status
- Prospective
- Sector
- Bridge, Car parking, Tunnel, Road, Government, Manufacturing (Industrial), Waste Processing and Treatment, Automotive
- Location
- Montana, United States of America
- Updated
- 19 Nov 2026
- Source
- Montana Department of Transportation (MDT)
ConstructChat
Ask ConstructChat about BAD ROUTE INTERCHANGE - SW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Bad Route Interchange - SW project is located on I-94 (eastbound and westbound lanes) beginning at the east end of the Yellowstone River Bridges (reference post 187.1) and extending about 5.7 miles to the Bad Route Rest Interchange (reference post 192.6). The project involves the reconstruction of about the 40 percent of the 5.7 miles towards the end of the project to correct the undulations in the roadway with the remainder receiving a mill and overlay. Additionally the project includes the rehabilitation or replacement of drainage structures in poor condition, median drainage improvements, bridge deck repairs on the Bad Route Interchange overpass, overlay of the Bad Route Interchange ramps, access road and rest area parking lot, wildlife exclusionary fencing from the Yellowstone River to a vehicular underpass about 4.2 miles east of the River, guardrail and signing upgrades. The purpose of this project is to extend the life of the existing pavement and address the dips in the road profile, rough ride and poor drainage with the goal of providing a safer, smoother roadway requiring less maintenance. |
Budget |
Location
Country | United States of America (USA) |
State | Montana |
Source
Source | Montana Department of Transportation (MDT) |
URL |
More Details
Record type | Project |
Sector | Bridge, Car parking, Tunnel, Road, Government, Manufacturing (Industrial), Waste Processing and Treatment, Automotive |
Article published date | 2024-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
