logo
ProjectClosed

Badam Coal Mining project of NTPC

The status, timeline and source of this project. A free account opens every field.

Source: India Investment Grid (IIG)

Information National Thermal Power Corporation [NTPC] has come up with Badam Coal Mining project of NTPC with a ticket size of 502 INR Crores. This project in Coal sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project This is a Coal Mining Project with Peak rated capacity of 3 million Metric tonne with a mine

Status
Closed
Sector
Geothermal, Water Supply and Storage, Power Generation (CCGT), Road, Government, Nuclear, Wind
Location
Hazaribagh, Jharkhand, India
Updated
22 Jul 2026
Source
India Investment Grid (IIG)

ConstructChat

Ask ConstructChat about Badam Coal Mining project of NTPC

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Badam Coal Mining project of NTPC” is an infrastructure initiative in the Geothermal sector, located in Hazaribagh, Jharkhand, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Participants

Sponsoring Agency

Company

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Information National Thermal Power Corporation [NTPC] has come up with Badam Coal Mining project of NTPC with a ticket size of 502 INR Crores. This project in Coal sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project This is a Coal Mining Project with Peak rated capacity of 3 million Metric tonne with a mineable reserves of 90.5 MT. Badam coal block was earlier allocated to Bihar State Power Generation Company Ltd [BSPGCL]. Ministry of Coal transferred this coal block to NTPC on 02.09.2019, after it acquired the Barauni thermal plant from the BSPGCL in December 2018. -Environment Clearance [EC] transferred to NTPC on 21.05.2020. -Feasibility Report has been approved by Project Sub-Committee of Board of NTPC on 09.07.2020. -Ground Water Clearance/NOC accorded by CGWB for Badam Coal Mining Project on 03.12.2021. -Stage-I FC transferred to NTPC from BSPGCL on 14.01.2020. Further, block covers an area of 3.27 sq. KM is bounded by latitude of 23o48 30 & 23o50 40N and longitude 85o17 10 and 85o18 25 E. It is located in the northeastern part of the North Karanpura Coalfield and within the administrative jurisdiction of Hazaribagh District. Badmahi River flowing roughly along the western part of the block. The distance from the block to Hazaribagh town is about 35 KM.

Original sector

Coal

Procurement method

Budget

Location

Country

India

State

Jharkhand

City

Hazaribagh

Source

Source

India Investment Grid (IIG)

URL

More Details

Record type

Project

Sector

Geothermal, Water Supply and Storage, Power Generation (CCGT), Road, Government, Nuclear, Wind

Article published date

2024-03-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project