Baglihar and Salal Dams Water Management
Completed · Jammu and Kashmir · Last reported May 2025
Source: Times of India
India has opened two gates at the Baglihar Hydroelectric Power Project and three gates at the Salal Dam to manage rising water levels due to heavy rainfall. This action follows a prior restriction of the Chenab River's flow, which was unprecedented and aimed at controlling water levels amidst tensions with Pakistan.
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Hydro
- Location
- Jammu and Kashmir, India
- Updated
- 22 Jul 2026
- Source
- Times of India
ConstructChat
Ask ConstructChat about Baglihar and Salal Dams Water Management
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | India has opened two gates at the Baglihar Hydroelectric Power Project and three gates at the Salal Dam to manage rising water levels due to heavy rainfall. This action follows a prior restriction of the Chenab River's flow, which was unprecedented and aimed at controlling water levels amidst tensions with Pakistan. |
Location
Country | India |
State | Jammu and Kashmir |
Source
Source | Times of India |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Hydro |
Article published date | 2025-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
