logo

Bahia Outfall PPP

Sector: Water Supply and Storage • Location: Brazil

Source: World Bank Group

Project
Active

In December 2006, a consortium led by Odebrecht SA [Brazil, 100%] signed an 18 year BOT contract by Embassa, the Bahia state water company, to construct and operate a 5.1km discharge pipeline, which was to extend 1.5km underground and 3.6km into the sea in the beach suburb of Jaguaribe in Bahia state. The sewerage collection and treatment was to serve a population of approximately 1.1 million.

Status
Prospective
Sector
Water Supply and Storage, Government, Power Transmission, Commercial, Power Generation (CCGT), Waste Processing and Treatment
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Bahia Outfall PPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Bahia Outfall PPP” is an infrastructure initiative in the Water Supply and Storage sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In December 2006, a consortium led by Odebrecht SA [Brazil, 100%] signed an 18 year BOT contract by Embassa, the Bahia state water company, to construct and operate a 5.1km discharge pipeline, which was to extend 1.5km underground and 3.6km into the sea in the beach suburb of Jaguaribe in Bahia state. The sewerage collection and treatment was to serve a population of approximately 1.1 million. The project was awarded in December 2006 through a competitive tender by offering the lowest amount of fixed payments. Odebrecht Investments made an initial bid of 4.29mn reais (US$1.97mn) for the monthly fees, and then lowered that proposal to 4.15mn reais - the lowest bid Embassa received. A rival consortium formed by Carioca Chistiani-Nielsen and Andrade Gutierrez presented a 5.3mn-real bid. In January 2007, the project was renegotiated by a new government in the state of Bahia citing concerns over Odebrecht’s rate of return and environmental hazards of the outfall. At the end of negotiations, Odebrecht conceded a 20% reduction in monthly payments. The total cost of the project was estimated at 240 million reais (US $131 million). The project reached financial closure in October 2008, when a PPP contract was signed between the federal government and Odebrecht SA which included a credit covering 70% of the project cost (172 million reais) with recourse to the Fundo de Garantia por Tempo de Serviço or federal workers unemployment insurance fund (FGTS). The remaining 30% was to be financed by Odebrecht SA. Monthly payments to Odebrecht were guaranteed by Embassa, which earmarked a portion of its revenues for the consortium. Operations commenced in May 2011. Figures converted based on the market rate, period average for 2008 published by the IMF.

Original sector

Water and sewerage

Procurement method

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Power Transmission, Commercial, Power Generation (CCGT), Waste Processing and Treatment

Article published date

2024-05-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project