logo

Bahrain's Hidd Independent Water Production (IWP) Project

Sector: Airport • Location: Al Hadd, Bahrain

Source: InfraPPPWorld

Project
Project In Tender

The project involves the development, financing, engineering, procurement, construction, ownership, operation, maintenance, and eventual transfer of the Hidd Independent Water Production (IWP) Project in Bahrain. The facility will be a large-scale seawater reverse osmosis (SWRO) desalination plant with a planned production capacity of approximately 60 million imperial gallons per day (MIGD) (aroun

Project Information FAQ

Project Information

3 Q
The project “Bahrain's Hidd Independent Water Production (IWP) Project” is an infrastructure initiative in the Airport sector, located in Al Hadd, Bahrain. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

project in tender

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the development, financing, engineering, procurement, construction, ownership, operation, maintenance, and eventual transfer of the Hidd Independent Water Production (IWP) Project in Bahrain. The facility will be a large-scale seawater reverse osmosis (SWRO) desalination plant with a planned production capacity of approximately 60 million imperial gallons per day (MIGD) (around 272,000 cubic metres per day) of potable water. The project will include seawater intake and outfall systems, desalination process units, water storage and pumping facilities, associated electrical and control systems, and connection to Bahrain's existing water transmission network. It is being procured by Bahrain's Electricity and Water Authority (EWA) under a PPP model, with the selected developer responsible for operating and maintaining the plant throughout the concession period before transferring it back to the authority.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data