logo

Baicheng County Ahebulong 1st Cascade Hydropower Station

Sector: Hydro • Location: Xinjiang Uyghur, China

Source: World Bank Group

Project
Active

In September 2011, construction of the Ahebulong 2nd Cascade Hydro Power Station commenced. The project was developed by a local private company Xinjiang Taisheng Energy Development Co., Ltd. which had a 100% stake in the project. By January 2012, RMB 40 million had been spent while the total investment was RMB 133 million (US$ 21.08 million). Therefore the project could be assumed to have reach

Status
Prospective
Sector
Hydro, Power Generation (CCGT), Government, Commercial
Location
Xinjiang Uyghur, China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Baicheng County Ahebulong 1st Cascade Hydropower Station

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Baicheng County Ahebulong 1st Cascade Hydropower Station” is an infrastructure initiative in the Hydro sector, located in Xinjiang Uyghur, China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In September 2011, construction of the Ahebulong 2nd Cascade Hydro Power Station commenced. The project was developed by a local private company Xinjiang Taisheng Energy Development Co., Ltd. which had a 100% stake in the project. By January 2012, RMB 40 million had been spent while the total investment was RMB 133 million (US$ 21.08 million). Therefore the project could be assumed to have reach financial closure (25% plus). The capacity of the plant was 15.4MW. Concession term was unknown.

Original sector

Energy

Procurement method

Budget

Location

Country

China

State

Xinjiang Uyghur

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Power Generation (CCGT), Government, Commercial

Article published date

2024-05-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project