logo

Baicheng Energy 600,000-kilowatt wind power Tongyu project (600MW)

Sector: Wind • Location: China

Source: World Bank Group

Project
Active

The porject comprises the construction of Tongyu wind power base of Baicheng Energy Investment Group with a capacity of 600MW. Construction started in the begining of November 2024. It is part of a major porject, divided into areas, Tongyu and Da'an, in Jilin Province, with a total capacity of 600,000 kilowatts (300,000 kilowatts in each project area) and a total investment of approximately $417.9

Project Information FAQ

Project Information

4 Q
The project “Baicheng Energy 600,000-kilowatt wind power Tongyu project (600MW)” is an infrastructure initiative in the Wind sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The porject comprises the construction of Tongyu wind power base of Baicheng Energy Investment Group with a capacity of 600MW. Construction started in the begining of November 2024. It is part of a major porject, divided into areas, Tongyu and Da'an, in Jilin Province, with a total capacity of 600,000 kilowatts (300,000 kilowatts in each project area) and a total investment of approximately $417.9m or 3 billion yuan. The Tongyu project area is located in Zhanyu Town, Xinhua Town and Xinfa Township of Tongyu County. The total area of ??the wind farm is 570 square kilometers, with an installed capacity of 300,000 kilowatts. A total of 48 6.25MW units are installed. The project is scheduled to be connected to the grid for power generation before June 30, 2025. After completion, the project is expected to deliver at least 1 billion kWh of clean energy to the State Grid each year. https://wind.imarine.cn/news/104291.html

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data