Bajgora Wind Farm
Sector: Wind • Location: Kosovo
Source: World Bank Group
The project involves the development, construction and operation of 105 MW Bajgora wind farm in n a mountainous area near Mitrovica, northern Kosovo. The energy will be transferred to KOSTT, the state-owned transmission company. The SPV Sowi Kosovo LLC is majority-owned and controlled by Enlight Renewable Energy Ltd, alongside its German and Kosovan partners. The total project cost is $128.6 milli
- Status
- Prospective
- Sector
- Wind, Raw Materials, Power Generation (CCGT), Government, Commercial
- Location
- Kosovo
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Bajgora Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the development, construction and operation of 105 MW Bajgora wind farm in n a mountainous area near Mitrovica, northern Kosovo. The energy will be transferred to KOSTT, the state-owned transmission company. The SPV Sowi Kosovo LLC is majority-owned and controlled by Enlight Renewable Energy Ltd, alongside its German and Kosovan partners. The total project cost is $128.6 million. EBRD approved a loan of EUR 58 million ($64.3 million), which represents half of the total required financing for the project. The rest of the financing is provided by Erste Group Bank and NLB Bank, both covered by the German export credit agency Euler Hermes. Financial close was reached on 11 December 2019. Upon completion, the farm will represent about 10% of Kosovo's installed capacity and avoid 247,000 tonnes of CO2 emissions annually. https://www.ebrd.com/news/2019/58m-ebrd-loan-to-build-kosovos-biggest-wind-farm.html https://ijglobal.com/articles/144570/ebrd-finances-105mw-wind-farm-in-kosovo |
Original sector | Energy |
Budget |
Location
Country | Kosovo |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Wind, Raw Materials, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
