logo

Bajo Frío Dam

Sector: Bridge • Location: Panama

Source: FCC Construction

Project
Closed

The site of the works can be found in the province of Chiriqui. This is close to the border with Costa Rica, between the towns of Breñón and Santa Cruz, in the Renacimiento district, and the town of Gómez, in the Bugaba district of Panama.The works carried out by FCC consist of building a gravity and loose material dam that is 56 meters high and 405 meters long. The first 240 meters consist of blo

Project Information FAQ

Project Information

3 Q
The project “Bajo Frío Dam” is an infrastructure initiative in the Bridge sector, located in Panama. Taiyo aggregates data on it from FCC Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The site of the works can be found in the province of Chiriqui. This is close to the border with Costa Rica, between the towns of Breñón and Santa Cruz, in the Renacimiento district, and the town of Gómez, in the Bugaba district of Panama.The works carried out by FCC consist of building a gravity and loose material dam that is 56 meters high and 405 meters long. The first 240 meters consist of blocks of conventional concrete and roller-compacted concrete, and the remaining 165 meters on the left bank of the dam consist of a loose material with a clay core.The dam has two spillways, one on a 90 meters long free nappe with a drainage capacity of 2,100 m3/s, and the other with two 6 x 5 m chutes and an evacuation capacity of 700 m3/s.The project includes two machinery houses: La Potra, which will house three main turbogenerator units with a total power of 28 MW plus a 2.10 MW auxiliary unit; and Salsipuedes, which will have three turbogenerator units with a total power of 28 MW.The project also includes conditioning the access roads to the dam, a bridge over the Chiriquí River, a 2.1 kilometers long water transmission channel, the loading chamber and the water intake for the Salsipuedes machinery house, which is located at the end of the water transmission channel, and a discharge channel that is approximately 110 m long through which the water flows back into the Chiriquí Viejo River.The aim of the hydrological project is to benefit the waterfall of the Chiriquí Viejo River, the source of which lies close to the Barú volcano at around 3,500 high.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data