BAKAD Road Concession
One of 8,411 projects Taiyo tracks in Kazakhstan.
Source: European Bank for Reconstruction and Development (EBRD)
The Project consists of the construction of a 66km long half-ring road in the north of Almaty. The Project will be implemented under a 20 years long Concession Agreement based on availability payment scheme. The construction is expected to be complete in 50-month period and will be followed by 16 year operating period. The route runs through the territory of Almaty Oblast in three districts: Karas
- Status
- Under Construction
- Sector
- Mass Transit, Rail, Road, Residential
- Location
- Kazakhstan
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about BAKAD Road Concession
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of the construction of a 66km long half-ring road in the north of Almaty. The Project will be implemented under a 20 years long Concession Agreement based on availability payment scheme. The construction is expected to be complete in 50-month period and will be followed by 16 year operating period. The route runs through the territory of Almaty Oblast in three districts: Karasay district in the west (27.5 km), Iliy district in the north (19.3 km) and Talgar district in the east (19.2 km). The road will comprise of a 51.5 km long 6-lane section and a 14.5 km long 4-lane section. The Project includes construction of 8 junctions, 21 bridges, 18 viaducts and 1 railway truss. The Concessionaire will be required to put in place the tolling operations and collect the tolls (tariffs to be set by the Grantor). The toll revenues collected will be transferred directly by the Concessionaire to the Kazakh authorities. In return, an availability fee will be paid to the Concessionaire by the Kazakh Republic for providing the motorway with a functioning tolling system for the duration of the concession period in accordance with pre-determined performance standards. There is a Project Summary Document available for this project. Full ESIA documentation is available locally at: • www.bakad.com.kz Environmental or social enquiries BAKAD Investment and Operation LLP Ayman Zhanuzakova, Contractor Grievance Focal Point Email address: ayman.zhanuzakova@bakad.com.kz Project Hotline: +7 727 335 83 41 |
Original sector | Transport |
Location
Country | Kazakhstan |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Rail, Road, Residential |
Article published date | 2026-06-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project