The Project consists of the construction of a 66km long half-ring road in the north of Almaty. The Project will be implemented under a 20 years long Concession Agreement based on availability payment scheme. The construction is expected to be complete in 50-month period and will be followed by 16 year operating period. The route runs through the territory of Almaty Oblast in three districts: Karas

Status
Under Construction
Sector
Mass Transit, Rail, Road, Residential
Location
Kazakhstan
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about BAKAD Road Concession

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “BAKAD Road Concession” is an infrastructure initiative in the Mass Transit sector, located in Kazakhstan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Not available for this record.

Status

Original status

signed

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project consists of the construction of a 66km long half-ring road in the north of Almaty. The Project will be implemented under a 20 years long Concession Agreement based on availability payment scheme. The construction is expected to be complete in 50-month period and will be followed by 16 year operating period. The route runs through the territory of Almaty Oblast in three districts: Karasay district in the west (27.5 km), Iliy district in the north (19.3 km) and Talgar district in the east (19.2 km). The road will comprise of a 51.5 km long 6-lane section and a 14.5 km long 4-lane section. The Project includes construction of 8 junctions, 21 bridges, 18 viaducts and 1 railway truss. The Concessionaire will be required to put in place the tolling operations and collect the tolls (tariffs to be set by the Grantor). The toll revenues collected will be transferred directly by the Concessionaire to the Kazakh authorities. In return, an availability fee will be paid to the Concessionaire by the Kazakh Republic for providing the motorway with a functioning tolling system for the duration of the concession period in accordance with pre-determined performance standards. There is a Project Summary Document available for this project. Full ESIA documentation is available locally at: • www.bakad.com.kz Environmental or social enquiries BAKAD Investment and Operation LLP Ayman Zhanuzakova, Contractor Grievance Focal Point Email address: ayman.zhanuzakova@bakad.com.kz Project Hotline: +7 727 335 83 41

Original sector

Transport

Location

Country

Kazakhstan

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Mass Transit, Rail, Road, Residential

Article published date

2026-06-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project