Baker Equipment Shed
One of 10,000+ projects Taiyo tracks in Oregon.
Source: Dodge USA
OTEC has a requirement for new equipment shed at it's headquarters facility. The successful bidder will provide design drawings and construct to completion a 30' wide, 60' long and 14' high 3-sided pole building to house trailers and utility equipment. The new equipment shed will be sited in the yard behind
- Status
- Closed
- Sector
- Commercial, Warehouse, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Baker City, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Baker Equipment Shed
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | OTEC has a requirement for new equipment shed at it's headquarters facility. The successful bidder will provide design drawings and construct to completion a 30' wide, 60' long and 14' high 3-sided pole building to house trailers and utility equipment. The new equipment shed will be sited in the yard behind |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Baker City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Warehouse, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
