Baker Ridge Water System Improvements
Closed · Virginia · Last reported Apr 2023
Source: Dodge USA
The Project includes the following Work:The base bid construction of approximately 4,722 linear feet of 6 water line, three 3 fire hydrants, two 2 blow-off assemblies, one 1 air release/vacuum valve, three 3 6 gate valves, four 4 2 gate valves, one 1 booster pump station with hydro-tank, and associated appurtenances
- Status
- Closed
- Sector
- Water Supply and Storage, Hydro, Government, Commercial, Waste Processing and Treatment
- Location
- Clintwood, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Baker Ridge Water System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work:The base bid construction of approximately 4,722 linear feet of 6 water line, three 3 fire hydrants, two 2 blow-off assemblies, one 1 air release/vacuum valve, three 3 6 gate valves, four 4 2 gate valves, one 1 booster pump station with hydro-tank, and associated appurtenances |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Clintwood |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hydro, Government, Commercial, Waste Processing and Treatment |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
