logo

Bakhtiyarpur- Barh 3rd Railway line, Bakhtiyarpur Flyover and Surface Triangle

Sector: Bridge • Location: Patna, Bihar, India

Source: India Investment Grid (IIG)

Project
Closed

Information East Central Railway [ECR] - II has come up with Bakhtiyarpur- Barh 3rd Railway line, Bakhtiyarpur Flyover and Surface Triangle with a ticket size of 401.72 INR Crores. This project in Railway Track sub-sector involves The current status of the project is Work Start - Appointed Date and is being developed through the PPP route. Economic/Social Impact of the Project To ensure uninterr

Project Information FAQ

Project Information

5 Q
The project “Bakhtiyarpur- Barh 3rd Railway line, Bakhtiyarpur Flyover and Surface Triangle” is an infrastructure initiative in the Bridge sector, located in Patna, Bihar, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information East Central Railway [ECR] - II has come up with Bakhtiyarpur- Barh 3rd Railway line, Bakhtiyarpur Flyover and Surface Triangle with a ticket size of 401.72 INR Crores. This project in Railway Track sub-sector involves The current status of the project is Work Start - Appointed Date and is being developed through the PPP route. Economic/Social Impact of the Project To ensure uninterrupted supply of coal to NTPC Barh Thermal Power Plant a 24.50km third line between Bakhtiyarpur link cabin and Barh is being constructed. The Rs 401.72 Crore project also consists of a rail-over-rail bridge at Bakhtiyarpur besides a surface triangle between Bakhtiyarpur Rajgir line and Athamalgola Bakhtiyarpur up line. 3rd line between Bakhtiyarpur to Barh and Surface triangle line between Bakhtiyarpur link to Karanauti 20Km has been completed and commissioned on 30.06.2019 Bakhtiyarpur Flyover/ROR 4.5Km is under progress.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data