BAKU PORT DEVELOPMENT
The status, timeline and source of this project. A free account opens every field.
Source: European Bank for Reconstruction and Development (EBRD)
Civil works, equipment and technical assistance to Port of Baku. The project aims to: (i) improve structures and equipment at the Port’s ferry terminal; (ii) restructure organisation of the port; and (iii) review tariff structures. Assist the port to become autonomous and profitable. Trade facilitation will be improved by increasing the efficiency of the port and Caspian Shipping Company and revie
- Status
- Closed
- Sector
- Residential
- Location
- Azerbaijan
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about BAKU PORT DEVELOPMENT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Civil works, equipment and technical assistance to Port of Baku. The project aims to: (i) improve structures and equipment at the Port’s ferry terminal; (ii) restructure organisation of the port; and (iii) review tariff structures. Assist the port to become autonomous and profitable. Trade facilitation will be improved by increasing the efficiency of the port and Caspian Shipping Company and reviewing legal and regulatory networks. Port of Baku. EBRD loan of EUR 16.2 million. The loan has a sovereign guarantee. EUR 20 million This project was screened as B/0, requiring an analysis of environmental impacts associated with the proposed development. The physical part of the project would consist of two components: (i) improvements to the ferry terminal, and (ii) improvements to the general and bulk cargo piers as well as the provision of new equipment to facilitate container handling. An environmental analysis was carried out on the general and bulk cargo pier component of the project as part of an overall technical assistance project funded by EC Tacis. That analysis was based on a scoping meeting held in Baku in September 1996 at which a Bank environmental specialist participated. The environmental analysis has been submitted to the EBRD and is currently being reviewed. The environmental analysis of the ferry terminal component of the project will be completed and submitted to the EBRD prior to approval of the loan by the Bank. Technical cooperation funding is proposed for: (i) engineering design and supervision; (ii) accounting systems and business planning; and (iii) operational support, including procurement and supervision of works. |
Original sector | Transport |
Location
Country | Azerbaijan |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Residential |
Article published date | 2026-06-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Residential projects in Azerbaijan
- Baku Electricity Network
- Sumgayitelektriksebeke
- Alibayramlielectricshebeke & Ganjaelectricshebeke
- Khizi - Absheron wind park
- Veyseloglu Modern Retail Expansion Project
- Azerbaijan: Trans Anatolian Natural Gas Pipeline Project (TANAP)
- Azerbaijan: Banka and Bilasuvar 760 MW Solar PV Power Project
- FIF - Bank Respublika MSME Loan III (EFSD+3)
