logo
ProjectComplete

BAKU PORT DEVELOPMENT

The status, timeline and source of this project. A free account opens every field.

Source: European Bank for Reconstruction and Development (EBRD)

Civil works, equipment and technical assistance to Port of Baku. The project aims to: (i) improve structures and equipment at the Port’s ferry terminal; (ii) restructure organisation of the port; and (iii) review tariff structures. Assist the port to become autonomous and profitable. Trade facilitation will be improved by increasing the efficiency of the port and Caspian Shipping Company and revie

Status
Closed
Sector
Residential
Location
Azerbaijan
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about BAKU PORT DEVELOPMENT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “BAKU PORT DEVELOPMENT” is an infrastructure initiative in the Residential sector, located in Azerbaijan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Not available for this record.

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Civil works, equipment and technical assistance to Port of Baku. The project aims to: (i) improve structures and equipment at the Port’s ferry terminal; (ii) restructure organisation of the port; and (iii) review tariff structures. Assist the port to become autonomous and profitable. Trade facilitation will be improved by increasing the efficiency of the port and Caspian Shipping Company and reviewing legal and regulatory networks. Port of Baku. EBRD loan of EUR 16.2 million. The loan has a sovereign guarantee. EUR 20 million This project was screened as B/0, requiring an analysis of environmental impacts associated with the proposed development. The physical part of the project would consist of two components: (i) improvements to the ferry terminal, and (ii) improvements to the general and bulk cargo piers as well as the provision of new equipment to facilitate container handling. An environmental analysis was carried out on the general and bulk cargo pier component of the project as part of an overall technical assistance project funded by EC Tacis. That analysis was based on a scoping meeting held in Baku in September 1996 at which a Bank environmental specialist participated. The environmental analysis has been submitted to the EBRD and is currently being reviewed. The environmental analysis of the ferry terminal component of the project will be completed and submitted to the EBRD prior to approval of the loan by the Bank. Technical cooperation funding is proposed for: (i) engineering design and supervision; (ii) accounting systems and business planning; and (iii) operational support, including procurement and supervision of works.

Original sector

Transport

Location

Country

Azerbaijan

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Residential

Article published date

2026-06-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project