logo
ProjectActive

Balabanli Onshore Wind Farm

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Borusan EnBW Enerji, a joint venture consisting of German energy supplier EnBW and Borusan Holding from Turkey, built a 50 MW onshore wind power plant near the city of Tekirdag in Turkey. Germany’s Siemens supplied a total of 22 wind turbines. Each of the wind turbines had a capacity of 2.3 megawatts (MW) and a rotor diameter of 108 meters. The installed capacity of 50 MW was sufficient to supply

Status
Prospective
Sector
Wind, Raw Materials, Power Generation (CCGT), Government, Commercial
Location
Turkey
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Balabanli Onshore Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Balabanli Onshore Wind Farm” is an infrastructure initiative in the Wind sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Borusan EnBW Enerji, a joint venture consisting of German energy supplier EnBW and Borusan Holding from Turkey, built a 50 MW onshore wind power plant near the city of Tekirdag in Turkey. Germany’s Siemens supplied a total of 22 wind turbines. Each of the wind turbines had a capacity of 2.3 megawatts (MW) and a rotor diameter of 108 meters. The installed capacity of 50 MW was sufficient to supply about 43.000 households with clean electricity. The project reached financial closure in February 2014. The Danish export credit agency, EKF, teamed up with Unicredit on a buyer credit facility in the amount of DKK 442 million to fund the export of Siemens wind turbines. The non-recourse project finance deal with ELO structure included USD 65.1 m ECA covered loan, USD 8 m commercial project finance loan, USD 5 m non-cash loan. The loan had a tenor of 13 years and 10 months. The wind farm became operational in September 2014. “The guarantee covered 95% of the senior debt equivalent to USD 68 million under EKF’s a buyer credit product and also included an export loan of USD 100million. EKF is the only public actor involved in the transaction by offering UniCredit Bank a guarantee in the form of a buyer credit. The EKF share is, therefore, 95% of senior debt equivalent to USD 68 million.”

Original sector

Energy

Budget

Location

Country

Turkey

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Wind, Raw Materials, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project