Bald Polana connects
Sector: Advanced Electronics • Location: Poland
Source: Keep.EU
The project involves modernisation of the DW 960 and road III/3078 with a total length of 4.76 km. The aim of the project is to increase road safety, the comfort of all road users, including improving the accessibility of the area for public transport and at the same time taking care of the environment. On the side of PW DW 960, it will be renovated on the section of PW DW
- 3.26 km connectin
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project involves modernisation of the DW 960 and road III/3078 with a total length of 4.76 km. The aim of the project is to increase road safety, the comfort of all road users, including improving the accessibility of the area for public transport and at the same time taking care of the environment. On the side of PW DW 960, it will be renovated on the section of PW DW 960. 3.26 km connecting Bukowina Tatra with the border crossing in Łysa Polana. The ZDW, acting on behalf of the Małopolskie Voivodeship, has accepted a notification for construction works dated 21.4. 2022. The scope of the works will cover the renovation of the existing road surface within the existing road lane, including the replacement of bitumen surfaces with the implementation of local reinforcements. In addition, the renovation of the roadside surface (use of destruction), bus bays and existing public and private exits will be carried out. Maintenance and renovation will be carried out by existing ditches it’s roadside. After completion of the construction works, traffic safety devices and roadway markings will be installed. On the PSK side, the road III/3078 with a length of 1.5 km will be modernised, the poor condition of the surface threatens the safety of travellers. The scope of works will include, among others: refurbishment of road surfaces, extension of the roadside along with the detachment of road ditches and reconstruction of road culverts, the sensors on the road near the meteorological station on the Podspády section will be modernised. After completion of the construction works, traffic safety devices will be installed and pedestrian crossing lighting and road marking will be carried out. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
