logo

Baldock Solar Station

Sector: Power Generation (CCGT) • Location: Oregon, United States of America

Source: Federal Highway Administration (FHWA)

Project
Close

The Baldock Solar Station is 1.75 megawatt solar array at the French Prairie Safety Rest Area (formerly Baldock Rest Area) on I-5, 14 miles south of Portland, Oregon. The 6,994-panel array is located on a seven-acre ODOT property and produces approximately 1.97 million kWh of renewable energy (enough to power over 285 homes). Construction began in early August 2011 and the array was connected to t

Project Information FAQ

Project Information

5 Q
The project “Baldock Solar Station” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Oregon, United States of America. Taiyo aggregates data on it from Federal Highway Administration (FHWA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Baldock Solar Station is 1.75 megawatt solar array at the French Prairie Safety Rest Area (formerly Baldock Rest Area) on I-5, 14 miles south of Portland, Oregon. The 6,994-panel array is located on a seven-acre ODOT property and produces approximately 1.97 million kWh of renewable energy (enough to power over 285 homes). Construction began in early August 2011 and the array was connected to the grid five months later. The Baldock Solar Station generates 12 percent of ODOT's electricity need in the Portland General Electric (PGE) Service Area, helping ODOT achieve its goal of using only renewable energy to power its statewide consumption by 2025. ODOT opted to deliver the Baldock Solar Station in partnership with PGE, the electric utility, since power generation was not a central business function. PGE's interest in the partnership lay in the legislatively mandated requirement for utilities to acquire 25 percent of their new electrical generation from renewable energy resources by 2025. Together, ODOT and PGE implemented the solar station through a third-party ownership development model. As private partner, PGE financed, built, owns, operates, and maintains the site. To finance the project, PGE took advantage of a state renewable energy tax credit program. PGE secured Bank of America as a tax equity partner, based on a sale-leaseback agreement. That is, the utility financed and constructed the project and sold it upon completion to the tax equity partner, which then leased it back to the utility to operate and maintain. At the end of the tax recapture period, PGE would have the option to purchase the solar array back from the tax equity partner at fair market value based on the present-day value of the sale of electricity generated for the remaining life of the project. Upon purchase, the utility would add the project to its electrical generation rate base. The agreement between ODOT and PGE extends for 25 years, with options during that time to renew in 5-year increments. When the agreement expires, PGE will either deconstruct the project and return the land to pre-project conditions or deliver it to ODOT at very low cost. If the land is needed at any time for an official purpose, ODOT may exercise its option to have the project removed. The cost for doing so decreases over time based on fair market value, which includes the remaining project value and the lost future energy sales. ODOT does not directly purchase the energy generated by the Baldock panels, so there is no power purchase agreement. In return for use of the land, ODOT receives a small annual site license fee and a percentage of the renewable energy certificates generated over the life of the project. ODOT's percentage is equal to its share of the above-market costs to the department (site assessments, staff time, consultant fees, and the costs of public involvement). It uses those certificates toward its electricity use and can legally state that the northbound and southbound French Prairie rest areas are powered by renewable energy produced by the solar array.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data