Baleine Gas Supply Project
Sector: Power Generation (CCGT) • Location: Abidjan, Côte d'Ivoire
Source: Eni
Eni and Petroci have announced a significant increase in gas supply for Côte d'Ivoire’s power generation system through Phase 2 of the Baleine project. This project aims to produce up to 70 million cubic feet of gas per day to meet local demand, ensuring a reliable supply for the country’s power generation needs and reinforcing Côte d'Ivoire’s role as a regional energy hub.
- Status
- Under Construction
- Sector
- Power Generation (CCGT)
- Location
- Abidjan, Cote d'Ivoire
- Updated
- 22 Jul 2026
- Source
- Eni
ConstructChat
Ask ConstructChat about Baleine Gas Supply Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Eni and Petroci have announced a significant increase in gas supply for Côte d'Ivoire’s power generation system through Phase 2 of the Baleine project. This project aims to produce up to 70 million cubic feet of gas per day to meet local demand, ensuring a reliable supply for the country’s power generation needs and reinforcing Côte d'Ivoire’s role as a regional energy hub. |
Original sector | Energy |
Location
Country | Cote d'Ivoire |
City | Abidjan |
Source
Source | Eni |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
