Baleine Project Phase 2
Under construction · Côte d'Ivoire · Last reported Dec 2024
Source: Offshore Engineer Magazine
Eni and Petroci have announced a significant increase in gas supply for Côte d'Ivoire’s power generation system from Phase 2 of the Baleine offshore project. This phase aims to strengthen the country's energy sector and ensure a reliable supply for local demand.
- Status
- Under Construction
- Sector
- Power Generation (CCGT)
- Location
- Cote d'Ivoire
- Updated
- 22 Jul 2026
- Source
- Offshore Engineer Magazine
ConstructChat
Ask ConstructChat about Baleine Project Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Eni and Petroci have announced a significant increase in gas supply for Côte d'Ivoire’s power generation system from Phase 2 of the Baleine offshore project. This phase aims to strengthen the country's energy sector and ensure a reliable supply for local demand. |
Original sector | Energy |
Location
Country | Cote d'Ivoire |
Source
Source | Offshore Engineer Magazine |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
