logo
ProjectUnder Construction

Baleine Project Phase 2

Under construction · Côte d'Ivoire · Last reported Dec 2024

Source: Offshore Engineer Magazine

Eni and Petroci have announced a significant increase in gas supply for Côte d'Ivoire’s power generation system from Phase 2 of the Baleine offshore project. This phase aims to strengthen the country's energy sector and ensure a reliable supply for local demand.

Status
Under Construction
Sector
Power Generation (CCGT)
Location
Cote d'Ivoire
Updated
22 Jul 2026
Source
Offshore Engineer Magazine

ConstructChat

Ask ConstructChat about Baleine Project Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Baleine Project Phase 2” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Côte d'Ivoire. Taiyo aggregates data on it from Offshore Engineer Magazine.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Eni and Petroci have announced a significant increase in gas supply for Côte d'Ivoire’s power generation system from Phase 2 of the Baleine offshore project. This phase aims to strengthen the country's energy sector and ensure a reliable supply for local demand.

Original sector

Energy

Location

Country

Cote d'Ivoire

Source

Source

Offshore Engineer Magazine

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2025-03-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project