Baleine Project Phase 3 Development
Sector: Oil and Gas • Location: Ivory Coast
Source: CNBC Africa
The third phase of the Baleine project in Ivory Coast involves a significant expansion of oil and gas production, including the construction of a new floating production, storage and offloading (FPSO) unit to enhance operational efficiency, safety, and reduce environmental impact. The project aims to increase oil production to 150,000 barrels per day and gas output to 200 million cubic feet per da
- Status
- Prospective
- Sector
- Oil and Gas, Manufacturing (Industrial)
- Location
- Cote d'Ivoire
- Updated
- 22 Jul 2026
- Source
- CNBC Africa
ConstructChat
Ask ConstructChat about Baleine Project Phase 3 Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The third phase of the Baleine project in Ivory Coast involves a significant expansion of oil and gas production, including the construction of a new floating production, storage and offloading (FPSO) unit to enhance operational efficiency, safety, and reduce environmental impact. The project aims to increase oil production to 150,000 barrels per day and gas output to 200 million cubic feet per day, with all gas directed to the domestic market to support energy needs and industrial development. |
Original sector | Energy |
Location
Country | Cote d'Ivoire |
Source
Source | CNBC Africa |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Manufacturing (Industrial) |
Article published date | 2026-05-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
