Baleshwar Kharagpur Expressway Limited

Sector: Road • Location: India

Source: World Bank Group

Project
Active

In March 2012, the National Highway Authority of India (NHAI) awarded a 24year concession (including construction period of 30 months) to IL&FS Transportation Networks Limited (ITNL) for the strengthening, improvement, six-laning, operation and maintenance, and tolling of 119.3kms of Kharagpur to Baleshwar section of NH-60 from KM 0.0 to KM 119.300 in the states of Orissa and West Bengal.

Under

Project Information FAQ

Project Information

5 Q
The project “Baleshwar Kharagpur Expressway Limited” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In March 2012, the National Highway Authority of India (NHAI) awarded a 24year concession (including construction period of 30 months) to IL&FS Transportation Networks Limited (ITNL) for the strengthening, improvement, six-laning, operation and maintenance, and tolling of 119.3kms of Kharagpur to Baleshwar section of NH-60 from KM 0.0 to KM 119.300 in the states of Orissa and West Bengal. Under the contract, ITNL was responsible for the design, construction, finance, operation and maintenance and strengthening of the existing 4-lane highway with paved shoulders. The scope included construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges, culverts, road intersections,interchanges, drains, etc.The expansion project, part of National Highway Development Project Phase-I, was expected to ease traffic congestion and give significant stimulus to trade and commerce in the entire region. IL&FS Transportation Networks Limited established Baleshwar Kharagpur Expressway Limited (BKEL), a special purpose vehicle, on 22nd March, 2012, to implement the project. The SPV won the tender through competitive bidding, conducted by NHAI, by quoting the highest annual premium. The SPV would pay NHAI a sum of US$6.5mn (INR 350mn @53.4 INR/USD) in the first year of operations with 5% increase in each subsequent year (This amounted to an NPV payout of about US$ 91mn over the life of concession period at a discount rate of 10%). There were 40 pre-qualified bidders for this project, out of which 5 had finally bid for this project. Under the contract, the SPV was to recover the capital costs and operating costs including returns through tolling during the term of concession. The concession agreement was signed on 24th April 2012. The project attained financial closure in October 2012 at a debt/equity ratio of 69/31. The estimated project cost at the time of financial closure was US$ 123.6mn (INR 6600mn @53.4 INR/USD). Financing comprised a senior debt of US$ 74.1mn (INR 3960mn), a subordinate debt of US$ 11.2mn (INR 600mn) and sponsor equity of US$ 38.2mn (INR 2040mn). ILFS was the adviser and the syndicating banks were led by State Bank of Patiala. The project debt would be amortized in 43 structured quarterly installments over December 2015-May 2026. Over 65% of BKEL’s debt was likely to be amortized in the last 4-years. Loan covenants stipulated maintaining a debt service reserve account equivalent to one quarter’s principal and interest payments (to be funded through a bank guarantee). For a substantial part of the project, the debt was at a floating interest rate (reset every 2-years). Construction on the project was expected to begin on 8th February (Appointed Date for start of Concession) and be completed by June 2015. According to the August 2013 lenders’ independent engineer’s report, the project was marginally ahead of schedule at 22.42% as against the planned progress of 19.34%. 100% right of way was available.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data