Bali Water Supply Project
Sector: Road • Location: Indonesia
Source: World Bank Group
In May 1997, a consortium of three local private investors was awarded a 20-year BOT contract for supplying water to the Nusa Dua and Kuta tourism areas in Bali. During the first stage of the project, the consortium was to build a 51,000 cubic meters per day treatment plant for the water of the Ayung River H which was to be integrated with the Ayung River I. The project also included the upgradin
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | In May 1997, a consortium of three local private investors was awarded a 20-year BOT contract for supplying water to the Nusa Dua and Kuta tourism areas in Bali. During the first stage of the project, the consortium was to build a 51,000 cubic meters per day treatment plant for the water of the Ayung River H which was to be integrated with the Ayung River I. The project also included the upgrading of the Teluk Berton pump to a capacity of 26,000 cubic meters per day and the installation of a transmission pipe along the route of Nusa Dua By Pass. The private consortium took a 55% stake in PT Tirta Arta Buana Mulia (TABM), the project company. PT Buana held 30% of TABM, PT Intan Dyandra Mulia 10% and PT Dewata Arta Kharisma 15%, while the state-owned PDAM Kabupaten held the remaining 45% of the project company. The overall investment required was Rp 9.2 billion (US$3.8 million). None None |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
