logo

Bali Water Supply Project

Sector: Road • Location: Indonesia

Source: World Bank Group

Project
Active

In May 1997, a consortium of three local private investors was awarded a 20-year BOT contract for supplying water to the Nusa Dua and Kuta tourism areas in Bali. During the first stage of the project, the consortium was to build a 51,000 cubic meters per day treatment plant for the water of the Ayung River H which was to be integrated with the Ayung River I. The project also included the upgradin

Project Information FAQ

Project Information

4 Q
The project “Bali Water Supply Project” is an infrastructure initiative in the Road sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In May 1997, a consortium of three local private investors was awarded a 20-year BOT contract for supplying water to the Nusa Dua and Kuta tourism areas in Bali. During the first stage of the project, the consortium was to build a 51,000 cubic meters per day treatment plant for the water of the Ayung River H which was to be integrated with the Ayung River I. The project also included the upgrading of the Teluk Berton pump to a capacity of 26,000 cubic meters per day and the installation of a transmission pipe along the route of Nusa Dua By Pass. The private consortium took a 55% stake in PT Tirta Arta Buana Mulia (TABM), the project company. PT Buana held 30% of TABM, PT Intan Dyandra Mulia 10% and PT Dewata Arta Kharisma 15%, while the state-owned PDAM Kabupaten held the remaining 45% of the project company. The overall investment required was Rp 9.2 billion (US$3.8 million). None None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data