logo

Balinzuoqi Wind and Solar Hydrogen and Methanol Project

Sector: Solar • Location: China

Source: World Bank Group

Project
Active

"The project comprises the construction of the green hydrogen and methanol production facility of the Balinzuoqi Wind and Solar Hydrogen and Methanol Production base, at the Phoenix Mountain Industrial Cluster Zone, Lindong Industrial Park, in Balinzuoqi, Inner Mongolia, China. It was officially approved and registed by the State authorities on March 22nd, 2024. The total capacity of the project i

Project Information FAQ

Project Information

4 Q
The project “Balinzuoqi Wind and Solar Hydrogen and Methanol Project” is an infrastructure initiative in the Solar sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

"The project comprises the construction of the green hydrogen and methanol production facility of the Balinzuoqi Wind and Solar Hydrogen and Methanol Production base, at the Phoenix Mountain Industrial Cluster Zone, Lindong Industrial Park, in Balinzuoqi, Inner Mongolia, China. It was officially approved and registed by the State authorities on March 22nd, 2024. The total capacity of the project is to produce 200,000 tons of green methanol annually. The sponor and Project unit is Balin Zuoqi Shengbu Solar Power Generation Co., Ltd. The total investment is $179.65m or 1293.917 million yuan, of which self-owned funds of $53.89m or 388.1751 million yuan, ?nd bank loan of $125.76m or 905.7419 million yuan. The construction start is planned for June 2024 and the end of construction stage for June 2026. The new facilities of the project include biomass gasification unit, methanol synthesis and distillation unit, sulfur recovery acid production unit, synthesis gas purification unit, full-field flare, methanol tank area, sulfuric acid tank area, Class A warehouse, integrated pump room, air compressed nitrogen station, circulating crystal station, desalted water station, main substation, office building, central control room, central laboratory, etc. " http://www.chinep.net/newsss/show.php?itemid=8489 http://www.chinep.net/newsss/show.php?itemid=8489

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data