Ball Aerospace R&D Buildings B & C - Phase 3
Planning schematics · Colorado · Last reported Mar 2024
Source: Dodge USA
Phase 3 involves two new buildings (Buildings B and C) that will be built within the parking lot on the west side of Commerce Street. The buildings will be physically connected, and each building will be approximately 40,000 s.f. - It is likely that these two buildings will not be built at the same time
- Status
- Prospective
- Sector
- Commercial, Aerospace & Defense, Car parking, Road, Automotive, Manufacturing (Industrial)
- Location
- Boulder, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Ball Aerospace R&D Buildings B & C - Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase 3 involves two new buildings (Buildings B and C) that will be built within the parking lot on the west side of Commerce Street. The buildings will be physically connected, and each building will be approximately 40,000 s.f. - It is likely that these two buildings will not be built at the same time |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Boulder |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Aerospace & Defense, Car parking, Road, Automotive, Manufacturing (Industrial) |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
